Electric Skyline carried out the full installation of a 49kW New Protocol Tritium Electric Vehicle (EV) Charger in Bray Town Centre, Co. Wicklow. The scope of works included the supply and installation of all necessary electrical infrastructure, including cabling, a large pillar unit, and a power distribution board to support the new fast-charging unit.

In addition to the electrical works, a range of associated civil engineering tasks were completed. These involved the marking of a designated EV charging bay, the installation of crash protection bollards, and all necessary groundwork and surface reinstatement to ensure a safe, durable, and accessible charging area.

All works were delivered to a high standard and in full compliance with current safety regulations and industry best practices, resulting in a reliable and fully operational EV charging point equipped to handle the latest vehicle communication protocols.

CLIENT
EasyGo

INDUSTRY
Public Infrastructure

LOCATION
Wicklow

STATUS
Completed 

SYSTEM INSTALLED

1 x 49kW New Protocal Tritium EV Charger