Electric Skyline undertook the complete installation of a 49kW Tritium Electric Vehicle (EV) Charger at a designated site in Portarlington, Co. Laois. The scope of works included the supply and installation of all required electrical cabling, a large pillar enclosure, and a power distribution board to support the new charging infrastructure.

As part of the project, associated civil engineering works were also carried out. These included the preparation and marking of dedicated EV parking bays, the installation of protective crash bollards, and all necessary groundwork and surface reinstatement to ensure a safe, accessible, and fully compliant installation.

All works were completed to a high standard and in line with current safety regulations and industry best practices, resulting in a fully functional and reliable EV charging facility for public use.

CLIENT
EasyGo

INDUSTRY
Public Infrastructure

LOCATION
Laois

STATUS
Completed 

SYSTEM INSTALLED

1 x 49kW Tritium EV Charger